Jump to content
Spring isolators to Tampere University Hospital
Quietly Improving Your Environment

Vibratec delivers Spring isolators to Tampere University Hospital

A helipad was to be built on the roof of Tampere University Hospital (TAYS). Helicopters cause vibrations that are transmitted to the building’s frame and cause disturbances. As the hospital environment is extremely sensitive to disturbance, this was something that needed to be prevented.

To eliminate the vibrations, Vibratec developed and installed customer-specific spring isolators in steel under the helipads steel frame. This made it possible for helicopters to land and take off from the helipad without affecting the ongoing work at the hospital.

Tampere University Hospital (TAYS)

Interested in spring isolators?

Feel free to contact us for more information

Contact Us

Vibratec at Nordbygg stand
  • Exhibitions
  • Construction

We are exhibiting at Nordbygg 2026

Vibratec will be present at Nordbygg 2026, taking place 21–24 April at Stockholmsmässan in Stockholm, Sweden.

Vibratec's flexible floor bracket VT-FFB for constructing elastic, floating floors, in markets where timber joists are 45 mm in thickness. This bracket comes in two versions depending on the size of your floor joists.
  • Construction
  • Infrastructure
  • Industrial

Lower build height, greater flexibility – Flexible Floor Bracket VT-FFB

A new, lower version of the Flexible Floor Bracket VT-FFB is now available, making it possible to construct floating floor systems using 45 × 45 mm timber joists.

Image of recording studio
  • Construction
  • Infrastructure
  • Industrial

Creating optimal acoustic environments – the “room-in-room” concept

The room in room concept is widely used in environments such as recording studios, rehearsal spaces, and other sound-sensitive rooms.